ANNUAL LIST of Projects and Small Jobs
Description |
Last Done |
Next | Comments |
|
Grounds & Lawns |
||||
| clean around flag pole | Spring 2011 | |||
| clean out flower beds (along house, stone walls & patio) | Spring 2011 | |||
| GS | Plant new flowers | Spring 2011 | ||
| Pick up foreign objects from lawns | Spring 2011 | as needed | ||
| Trim Small Scrubs around house and patio | Spring 2011 | Cut back to ground level | ||
| remove debris from driveway and front entrance walkway | Spring 2011 | as needed | ||
| Maint | mow and trim lawns | Spring 2011 | 1 month cycle | |
| Replace missing mortar around patio walls | Spring 2011 | |||
| Maint | Remove Mower deck from Tractor | Spring 2011 | ||
| Maint | Change oil & filter on Tractor | Spring 2011 | ||
| Maint | Grease Tractor & Mower deck | Spring 2011 | ||
Barn |
||||
| Straighten up & Clean inside Barn | Spring 2011 | |||
Shed |
||||
| secure side windows from animals entering | Summer 2010 | Spring 2011 | ||
| Straighten up & Clean inside Shed | Summer 2010 | Spring 2011 | ||
House |
||||
| Vacuum all floors inside house >> each unit | After each use | After each use | After each use | |
| Maint | Clean oven Annually | Spring 2011 | ||
| Clean Vacuum Cleaner (empty plastic bin) - Do Not throw away any parts to the vacuum cleaner! |
After each use | After each use | ||
| Maint | Repair Ping Pong Table | Summer 2010 | As needed | |
| Assemble bed frames in front bedroom | Summer 2010 | Spring 2011 | ||
Carpentry |
||||
| Maint | Replace wooden Cellar steps | Summer 2011 | ||
| Maint | Replace broken/cracked thermo pane window 2nd floor stairwell | Summer 2011 | ||
| Contractor | R&R door casings on outside doors | Summer 2011 | ||
| Contractor | Replace Broken threshold on back doors | Summer 2011 | ||
| Maint | Install trim for access panel to shower - 2nd floor bathroom | Summer 2011 | ||
| Maint | Install Hand-rails in stairwell | Spring 2011 | ||
|
Painting & Wallpapering |
||||
| Scrape, Prime & Paint outside doors (4) | Spring 2011 | |||
| Remove old wallpaper 2nd floor stairwell & hallway | Summer 2011 | |||
| Repair & Patch walls - 2nd floor stairwell & hallway | Summer 2011 | |||
| Reattach wallpaper in front upstairs bedroom | Summer 2011 | |||
|
Plumbing |
||||
| Replace Kitchen Faucet (2) | Spring 2011 | |||