slate-sign.jpg (77354 bytes)
By: Hopkinton Troop 2247

Camp MacGregor
Small Projects List
                          -------------------------------------------------------   
revised 02/21/2011

We are asking for more help doing projects and small jobs around Camp MacGregor.
If you have a suggestion or an Idea for the Camp? Email it to Rick.
For further information or to volunteer  - Contact Rick via
email: coordinator@hsla.org

ANNUAL LIST of Projects and Small Jobs

 

Description

Last Done

Next

Comments

 

Grounds & Lawns

     
  clean around flag pole   Spring 2011  
  clean out flower beds (along house, stone walls & patio)   Spring 2011  
GS Plant new flowers   Spring 2011  
  Pick up foreign objects from lawns   Spring 2011 as needed
  Trim Small Scrubs around house and patio   Spring 2011 Cut back to ground level
  remove debris from driveway and front entrance walkway   Spring 2011 as needed
Maint mow and trim lawns   Spring 2011 1 month cycle
  Replace missing mortar around patio walls   Spring 2011  
         
Maint Remove Mower deck from Tractor   Spring 2011  
Maint Change oil & filter on Tractor   Spring 2011  
Maint Grease Tractor & Mower deck   Spring 2011  
         
         
 

Barn

     
  Straighten up & Clean inside Barn   Spring 2011  
         
 

Shed

     
  secure side windows from animals entering Summer 2010 Spring 2011  
  Straighten up & Clean inside Shed Summer 2010 Spring 2011  
         
 

House

     
  Vacuum all floors inside house >> each unit After each use After each use After each use
Maint Clean oven Annually   Spring 2011  
  Clean Vacuum Cleaner (empty plastic bin)
    - Do Not throw away any parts to the vacuum cleaner!
After each use After each use  
Maint Repair Ping Pong Table Summer 2010 As needed  
  Assemble bed frames in front bedroom Summer 2010 Spring 2011  
         
         
 

Carpentry

     
Maint Replace wooden Cellar steps   Summer 2011  
Maint Replace broken/cracked thermo pane window 2nd floor stairwell   Summer 2011  
Contractor R&R door casings on outside doors   Summer 2011  
Contractor Replace Broken threshold on back doors   Summer 2011  
Maint Install trim for access panel to shower - 2nd floor bathroom   Summer 2011  
Maint Install Hand-rails in stairwell   Spring 2011  
         
 

Painting & Wallpapering

     
  Scrape, Prime & Paint outside doors (4)   Spring 2011  
  Remove old wallpaper 2nd floor stairwell & hallway   Summer 2011  
  Repair & Patch walls - 2nd floor stairwell & hallway   Summer 2011  
  Reattach wallpaper in front upstairs bedroom   Summer 2011  
         
 

Plumbing

     
  Replace Kitchen Faucet (2)   Spring 2011  
         
         
         

Return to Directory